PharmaCorp Building 7
PharmaCorp Industries
4200 Industrial Blvd, Research Triangle Park, NC 27709
Maria Chen
maria.chen@pharmacorp.example.com
20 tracked assets
Last data sync: March 15, 2026
Total Equipment
20
Avg Condition
76
Critical Items
0
Compliance Overdue
1
Capital Backlog
$495K
Equipment Condition Distribution
10Good (80-100): 10
6Fair (60-79): 6
3Poor (40-59): 3
Critical (<40): 1
Good (80-100)10
Fair (60-79)6
Poor (40-59)3
Critical (<40)1
Criticality Breakdown
Critical
8
High
9
Medium
3
Low
0
Top Risks
Recent Maintenance Activity
WO-2026-0030V-401inspection
API 653 tank inspection — V-401
Aug 1, 2026WO-2026-0025P-101preventive
Semi-annual vibration analysis — P-101
May 20, 2026WO-2026-0026P-102preventive
Semi-annual vibration analysis — P-102
May 20, 2026WO-2026-0028C-501preventive
Annual compressor service — C-501. Oil analysis, filter replacement, valve over…
Apr 20, 2026WO-2026-0022R-201inspection
Annual internal inspection of R-201 glass lining
Apr 1, 2026Upcoming Compliance Deadlines
OSHA PSM 29 CFR 1910.119Overdue
Mechanical integrity inspection — P-401 solvent recovery pump
Due Oct 10, 2025157d overdue
FDA 21 CFR Part 211.65Due Soon
WFI system qualification — HX-401 heat exchanger capacity verification post tube plugging
Due Apr 30, 202645d remaining
OSHA 29 CFR 1910.147Due Soon
Lockout/tagout (LOTO) program annual review — verify energy control procedures for all equipment
Due May 30, 202675d remaining